Midtown Multi Purpose
Space by Rowena
& Takashi
Rowena & Takashi, Inc. is launching
midtown Sacramento retail & salon space in early 2010. The new
facility features an Elixir Bar, retail/shopping, Davines Multi Space
Salon and Studio 99. The Elixir bar serves Elixir tonics; an
alternative high-vibration beverage and light snacks. The retail space features
Davines,
I NUOVI and other exclusive products
including, professional salon tools, accessories, apparel, self-help books
and international music. The salon provides individualized services
by departmentalized specialists. When we
established our first location in the El Dorado Hills business park, we committed to
assimilate and contribute to local culture. After 10 years in
business, we are moving forward to provide our celebrated services and
enjoyable employment opportunity in a well-designed environment.
Please come back to this page for the project
progress and updates.
Project History
12/11/2006 Draft floor plan finished
01/17/2007 Prelim. lease contract with Mansour for Town
Center
01/23/2007 1st meeting with a contractor Geoff Laurin
02/02/2007 1st meeting with an architect William A. King
02/03/2007 2-floor plan disapproved by Mansour
02/12/2007 1st meeting with general manager
03/01/2007 Mansour decided to switch the original space with an art
gallery
03/07/2007 Considering Palladio at Broadstone, Folsom
03/20/2007 Contract signed with James A Clayton & Co. for
the new
facility search
03/25/2007
2nd meeting with an architect William King
03/29/2007 J Street building (21st & J, next to the bridal
store) to be considered
04/16/2007 2 properties in Mid Town Sacramento viewed
04/18/2007 2109 J Street building tour
04/22/2007 2109 J Street building reduced from 2 million to
1.5 million
04/23/2007 Critical advise from Heritage Bank regarding 2109 J
building
05/07/2007 Critical advise from William King regarding
remodel of 2109 J
05/08/2007 2109 J building reevaluation - existing structure unsuitable for our
plan
05/09/2007 2012 P building listed, visited - undesirable
location
05/10/2007 2109 J building resurrected for its location,
prepare to make an offer
05/16/2007 William King visits Sacramento and inspects 2109 J
building
05/17/2007 2109 J building needs to be demolished and built
new to suit our needs
05/18/2007 Additional funding necessary in order to pursuit
2109 J
06/12/2007 Perkins Commercial Group called us to consider
Montaņo El Dorado Hills
06/16/2007 William King reviewed Montaņo and approved to
proceed
06/17/2007 Montaņo pad D1 & D2 totaling 3,300 sf to be
considered (see diagram)
07/03/2007 MARRS invited
us to consider J & 20th facility
07/12/2007 2700 J St (Mosaic Salon building) is now for sale,
location to consider
07/20/2007 Meeting with MARRS
07/21/2007 Meeting with Architect in L.A.
08/21/2007 New salon to be postponed until Feb 2009 due to the
introduction of I NUOVI Professional,
a new makeup line from Asia.
10/20/2007 Desirable building on market. The plan resurrected
for revision. 920 20th Street. building features two story,
rehabbed brick, 12,500 SF, next to public parking. Due to the large
floor space, we are expanding our shopping space including cosmetics,
apparels and tea & tonics.
03/24/2008 Revisit to 920 20th Street. Initial meeting with
Umpqua Bank and investor.
06/30/2008 Meeting with MARRS
10/06/2008 Meeting with L Loft (L & 18th)
3/10/2009 Meeting with Suede Salon in regards to
downtown projects
4/21/2009 Meeting with Heller Pacific in regards to
possible location
5/21/2009 Final choices for relocation. 1.
Firestone Building (16 & L), L Loft (18 & L) or MARRS (20 & J)
6/14/2009 Meeting with L Loft and MARRS
6/21/2009 L Loft review
7/1/2009 Funding process began
7/12/2009 Meeting with Architect regarding L Loft
9/1/2009 Funding phase 1 completed
10/31/2009 Funding phase 2 completed
11/15/2009 Funding phase 3 completed
12/15/2009 2 choices left for the new Sacramento location
12/23/2009 Meeting with an architect and building owners
1/21/2010 Funding phase 4 completed
1/28/2010 Narrowing down to 3 properties in
downtown/midtown
1/29/2010 Meeting with architect
2/17/2010 Meeting with Cathedral Building owner
2/25/2010 Mutually agreed on LOI with Clippinger
Investment properties
3/5/2010 Meeting with architect and
contractor at the site. TI starts immediately..
|