Midtown Multi Purpose Space by Rowena & Takashi

Rowena & Takashi, Inc. is launching midtown Sacramento retail & salon space in early 2010.  The new facility features an Elixir Bar, retail/shopping, Davines Multi Space Salon and Studio 99.  The Elixir bar serves Elixir tonics; an alternative high-vibration beverage and light snacks.  The retail space features Davines, I NUOVI and other exclusive products including, professional salon tools, accessories, apparel, self-help books and international music.  The salon provides individualized services by departmentalized specialists.  When we established our first location in the El Dorado Hills business park, we committed to assimilate and contribute to local culture.  After 10 years in business, we are moving forward to provide our celebrated services and enjoyable employment opportunity in a well-designed environment. 

Please come back to this page for the project progress and updates.

Project History
12/11/2006   Draft floor plan finished
01/17/2007   Prelim.  lease contract with Mansour for Town Center
01/23/2007   1st meeting with a contractor Geoff Laurin
02/02/2007   1st meeting with an architect William A. King
02/03/2007   2-floor plan disapproved by Mansour
02/12/2007   1st meeting with general manager
03/01/2007   Mansour decided to switch the original space with an art gallery
03/07/2007   Considering Palladio at Broadstone, Folsom
03/20/2007   Contract signed with James A Clayton & Co. for the new facility search

03/25/2007   2nd meeting with an architect William King
03/29/2007   J Street building (21st & J, next to the bridal store) to be considered
04/16/2007   2 properties in Mid Town Sacramento viewed
04/18/2007   2109 J Street building tour
04/22/2007   2109 J Street building reduced from 2 million to 1.5 million
04/23/2007   Critical advise from Heritage Bank regarding 2109 J building
05/07/2007   Critical advise from William King regarding remodel of 2109 J
05/08/2007   2109 J building reevaluation - existing structure unsuitable for our plan
05/09/2007   2012 P building listed, visited - undesirable location
05/10/2007   2109 J building resurrected for its location, prepare to make an offer
05/16/2007   William King visits Sacramento and inspects 2109 J building
05/17/2007   2109 J building needs to be demolished and built new to suit our needs
05/18/2007   Additional funding necessary in order to pursuit 2109 J
06/12/2007   Perkins Commercial Group called us to consider Montaņo El Dorado Hills
06/16/2007   William King reviewed Montaņo and approved to proceed
06/17/2007   Montaņo pad D1 & D2 totaling 3,300 sf to be considered (see diagram)
07/03/2007   MARRS invited us to consider J & 20th facility
07/12/2007   2700 J St (Mosaic Salon building) is now for sale, location to consider
07/20/2007   Meeting with MARRS
07/21/2007   Meeting with Architect in L.A.
08/21/2007   New salon to be postponed until Feb 2009 due to the introduction of I NUOVI Professional, a new makeup line from Asia. 
10/20/2007  Desirable building on market.  The plan resurrected for revision.  920 20th Street.  building features two story, rehabbed brick, 12,500 SF, next to public parking.  Due to the large floor space, we are expanding our shopping space including cosmetics, apparels and tea & tonics.
03/24/2008  Revisit to 920 20th Street.  Initial meeting with Umpqua Bank and investor.
06/30/2008  Meeting with MARRS
10/06/2008  Meeting with L Loft (L & 18th)
3/10/2009    Meeting with Suede Salon in regards to downtown projects
4/21/2009    Meeting with Heller Pacific in regards to possible location
5/21/2009    Final choices for relocation.  1. Firestone Building (16 & L), L Loft (18 & L) or MARRS (20 & J) 
6/14/2009    Meeting with L Loft and MARRS
6/21/2009    L Loft review
7/1/2009      Funding process began
7/12/2009    Meeting with Architect regarding L Loft
9/1/2009      Funding phase 1 completed
10/31/2009  Funding phase 2 completed
11/15/2009  Funding phase 3 completed
12/15/2009  2 choices left for the new Sacramento location
12/23/2009  Meeting with an architect and building owners
1/21/2010    Funding phase 4 completed
1/28/2010    Narrowing down to 3 properties in downtown/midtown
1/29/2010    Meeting with architect
2/17/2010    Meeting with Cathedral Building owner
2/25/2010    Mutually agreed on LOI with Clippinger Investment properties
3/5/2010      Meeting with architect and contractor at the site.  TI starts immediately..